§ 62-219. Permit and inspection fees.  


Latest version.
  • (a)

    Administration and inspection charge for single tap.

    (1)

    Tap without accessories, $50.00 per connection.

    a.

    Administration (city), $15.00.

    b.

    Inspection (POTW), $35.00.

    (2)

    Tap with accessories (grease trap, sand interceptor, manhole, etc.), $85.00 per connection.

    a.

    Administration (city), $15.00.

    b.

    Inspection (POTW), $70.00.

    (b)

    For all sanitary sewer construction, a construction inspection fee of $0.25 per linear foot shall be paid to the city engineering department at the time of permit application for deposit in the wastewater department of the city utilities.

    (c)

    All newly constructed sanitary sewers eight inches or larger shall be video inspected by the city sewer maintenance department or its authorized agent. Fees for video inspection shall be paid to the city engineering department at the time of permit application for deposit in the wastewater department of the city utilities in accordance with the following schedule:

    (1)

    1,000 linear foot minimum ..... $550.00

    (2)

    1,000 linear foot and greater, per linear foot ..... 0.55

    Projects or services performed for governmental units may be exempt from these fees.

(Ord. No. 5265, § 2, 8-2-2010)