§ 62-221. Industrial wastewater discharge permit fees (POTW).  


Latest version.
  • (a)

    Prior to connecting to or discharging to the POTW, all users discharging industrial waste shall apply for a wastewater discharge permit. Wastewater discharge permits must be renewed every five years. Any industry so required to obtain a wastewater discharge permit shall pay a wastewater discharge permit fee as shown in the table below every five years to the city wastewater utility. This fee includes all annual permit reviews, site inspections and industrial user self-monitoring report reviews. Industries which are required to monitor more than one point of discharge to the city's sewer system shall pay a discharge monitoring fee as shown in the table below for each additional point of discharge per five-year period.

    Prior to
    7/1/2006
    7/1/2006 and
    Thereafter
    Five-year wastewater discharge permit fee $600.00 $738.00
    Five-year wastewater discharge monitoring fee 450.00 553.50

     

    (b)

    The following industrial wastewater discharge permit fees are in addition to the rates and charges set forth in division 6 of this article and shall be paid by all wastewater discharge permit holders in accordance with the following average monthly flow table:

    Charges Per 100 Cubic Feet of Flow
    Prior to
    7/1/2006
    7/1/2006 and
    Thereafter
    First 80,000 cubic feet $0.2424 $0.2982
    Next 120,000 cubic feet 0.1814 0.2231
    Next 200,000 cubic feet 0.1218 0.1498
    Over 400,000 cubic feet 0.0610 0.0750

     

(Ord. No. 5265, § 2, 8-2-2010)