§ 117-39. Post-construction stormwater plan required.  


Latest version.
  • A post-construction stormwater pollution prevention plan (SWPPP) as identified herein shall be required for all significant land disturbing activities. No land user shall begin a significant land disturbing activity without submitting a post-construction SWPPP. Two copies of the post-construction SWPPP shall be submitted prior to or concurrently with the improvement location permit application and erosion control plan. Post-construction SWPPPs submitted and approved as part of the review of final development plans need not be resubmitted and can merely be referenced on the improvement location permit application. Although subject to the performance requirements of section 117-10, projects approved by the city or the soil and water conservation service under Rule 5 prior to the establishment of this chapter shall not be required to submit a post-construction SWPPP as required herein.

(Ord. No. 5085, § 1(162.22), 12-4-2006)