§ 137-675. Final PUD.  


Latest version.
  • At the time of filing for final PUD approval with the plan commission, the following shall also be included on the final PUD site plan:

    (1)

    Building facade rendering.

    (2)

    Landscape buffering location, height and materials.

    (3)

    Proposed property landscape features.

    (4)

    Security lights location and height.

    (5)

    All signs shall conform with requirements of chapter 129.

    (6)

    Finish topographic elevations on a uniform grid using United States Geodetic Survey (U.S.G.S.) datum.

    (7)

    Location and capacity calculations of storm drainage facilities.

    (8)

    Location and capacity calculations of water service facilities.

    (9)

    Location and capacity calculations of sewer facilities.

    (10)

    Location and capacity calculations of electric facilities.

    (11)

    Location of fire protection facilities.

    (12)

    Curb cut slope and return radii.

    (13)

    Legal description of all rights-of-way and easements to be accepted by the board of public works.

    (14)

    Sufficient additional data as may be required by the plan commission or city council subsequent to the approved preliminary site plan.

(Code 1985, § 159.189; Ord. No. 2947, 10-6-1986; Ord. No. 3363, 3-19-1990)