§ 117-14. As-built requirements.  


Latest version.
  • (a)

    Prior to final release of the bond provided for in section 117-47, the as-built condition of critical stormwater management features must be identified and approved.

    (b)

    The volume, slopes, configuration, condition and topographic information of all detention, retention and water quality practices shall be certified by a professional engineer licensed in the state. This information shall be provided to the city in the form of a scaled as-built drawing or other electronic form accepted by the city. The as-built certification shall indicate if final conditions are consistent with, or exceed, the provisions of the post-construction stormwater pollution prevention plan (SWPPP).

    (c)

    If it is determined that information provided in the as-built drawing, certification, inspection or survey of the site does not meet or exceed the post-construction SWPPP provisions, the city reserves the right to withhold the final bond until such time as site conditions meet or exceed the plan provisions. Furthermore, other enforcement mechanisms may be applied to the permittee or persons making certifying statements.

(Ord. No. 5085, § 1(162.31), 12-4-2006)